Slide 1

Slide notes: The Job Master is directly accessible from the Planned Maintenance Menu, because each Maintenance Master is a Job.

 

 

 

Slide 2

Slide notes:

 

 

 

Slide 3

Slide notes:

 

 

 

Slide 4

Slide notes: We can define a new Job here, but usually the Job already exists, and when we include it on the Planned Maintenance Master, then we need to ensure that it has the Cost Types listed, with the required auto Debit Accounts, as specified for the Planned Maintenance operation. Note here the 3 Cost Types for Planned Maintenance.

 

 

 

Slide 5

Slide notes:

 

 

 

Slide 6

Slide notes:

 

 

 

Slide 7

Slide notes: We do not discuss the full procedure for opening a new Job here. That is available in the Job Costing tutorials. The important point to note is that we need to have the correct Cost Types listed for Maintenance.

 

 

 

 

Slide 8

Slide notes: Let us quickly look at the Control Parameters for Planned Maintenance.

 

 

 

Slide 9

Slide notes: And here we can see the Cost Types specified for Planned Maintenance charges. So these are the Cost Types that we need to include for all Jobs that we list on the Planned Maintenance Master, in addition to any other Cost Types used on these Jobs already.

 

 

 

Slide 10

Slide notes:

 

 

 

Slide 11

Slide notes: