Slide
notes: While working with an Active Maintenance Event, we have a need to
load Resource Items. We will now have a look at how that is done.
Slide 2
Slide
notes:
Slide 3
Slide
notes: This Event has a Bill of Materials already indicated, but it is
never loaded unless we choose to do so.
Slide 4
Slide
notes:
Slide 5
Slide
notes: On the Resources tab, we find the area where we load Resource Items
that will be utilized by and charged to this Event. We can load from a Bill
of Materials.
Slide 6
Slide
notes: If this Event has a default Bill of Materials indicated, then it is
offered. We can choose that Bill, or load from an entirely different Bill
of Materials, or both. We will use the default Bill in this case.
Slide 7
Slide
notes:
Slide 8
Slide
notes: When we select the Bill, the standard list of Items as specified on
the Bill Master is loaded for this Event. We can of course make changes,
change quantities or even delete some items.
Slide 9
Slide
notes: We can also manually add any number of Items from the Catalog,
without using a Bill or in addition to 1 or more Bills.
Slide 10
Slide
notes:
Slide 11
Slide
notes:
Slide 12
Slide
notes:
Slide 13
Slide
notes:
Slide 14
Slide
notes:
Slide 15
Slide
notes:
Slide 16
Slide
notes: So it is quite easy to populate all required resources for the
Maintenance Event.