Slide 1

Slide notes: In execution of the Condition Monitoring program, we may export the list of Maintenance Items that are due for inspection. After inspection, we need to import the results.

 

 

 

Slide 2

Slide notes:

 

 

 

Slide 3

Slide notes: First we consider the required data layout.

 

 

 

Slide 4

Slide notes: What we need absolutely are the 2 first columns, indicating in each case the Maintenance Master Key, and the Condition as reported. Optionally, we may also indicate the name of the Inspector, any further action that may be required, and an Inspection date.

 

 

 

Slide 5

Slide notes: This is what our Spread Sheet looked like when we produced the Inspection Report. Therefore, we can retain the Master Keys in column 1, delete the rest, and feed our results in the columns starting with column 2.

 

 

 

Slide 6

Slide notes: So, in our example here, this is what our results look like. We are not indicating the optional columns, only the 1st 2 that are essential. So we save this as a CSV, which we can now import.

 

 

 

Slide 7

Slide notes:

 

 

 

Slide 8

Slide notes:

 

 

 

Slide 9

Slide notes:

 

 

 

Slide 10

Slide notes:

 

 

 

Slide 11

Slide notes:

 

 

 

Slide 12

Slide notes:

 

 

 

Slide 13

Slide notes:

 

 

 

Slide 14

Slide notes:

 

 

 

Slide 15

Slide notes:

 

 

 

Slide 16

Slide notes:

 

 

 

Slide 17

Slide notes: If the validation report lists nothing between the 'start' and 'end' indicators then it means everything is in order.

 

 

 

Slide 18

Slide notes: The process status will therefore change to "data validations passed" and we can perform the Take On.

 

 

 

Slide 19

Slide notes:

 

 

 

Slide 20

Slide notes:

 

 

 

Slide 21

Slide notes:

 

 

 

Slide 22

Slide notes: Just for curiosity sake, we can now check one of the Maintenance Items that were on the Inspection List.

 

 

 

Slide 23

Slide notes:

 

 

 

Slide 24

Slide notes:

 

 

 

Slide 25

Slide notes:

 

 

 

Slide 26

Slide notes:

 

 

 

Slide 27

Slide notes:

 

 

 

Slide 28

Slide notes: Notice that the latest status at 'Condition Monitor' reflects the result of the last inspection.

 

 

 

Slide 29

Slide notes: And when we drill into the Condition Program master record, we can also see all results of Condition Monitoring on this Maintenance Item. In this case, the Item is new on the Condition Monitor program and we have only 1 result so far.

 

 

 

Slide 30

Slide notes:

 

 

 

Slide 31

Slide notes:

 

 

 

Slide 32

Slide notes:

 

 

 

Slide 33

Slide notes:

 

 

 

Slide 34

Slide notes:

 

 

 

Slide 35

Slide notes: